Roadrunners operational document
Blood and Tissue Transport Method Statement
This method statement covers dedicated collection, direct transport and delivery of blood, tissue and other biological samples.
Reviewed 3 October 2026
The consignor is responsible for classifying the material and supplying compliant packaging, marks, labels, documentation, temperature limits and handling instructions. Roadrunners must be told about these requirements before accepting the booking.
Download the method statementAcceptance limits and customer responsibilities
Routine acceptance is limited to consignments that Roadrunners has assessed and agreed. Category A infectious substances, dry ice, liquid nitrogen, genetically modified material, exempt specimens and any other separately regulated or unusually hazardous material require a separate documented assessment and written acceptance before collection. Where the Human Tissue Act applies, the customer remains responsible for its licence, consent, traceability and any required third-party agreement.
- Confirm the sample classification, number of packages, required temperature range, delivery deadline and named contacts.
- For UN3373 Biological Substance, Category B, the consignor must confirm that packaging complies with P650. The driver performs an external check only and does not certify hidden packaging components.
- Use an ADR-qualified driver only where the classification and applicable transport rules require one; UN3373 alone does not require an ADR-qualified driver.
Collection
The courier reports to reception and records the time-stamped RRD app status “arrived at collection”. The courier checks the package externally against the booking instructions without opening it. Visible damage, leakage, incorrect labelling or an unexplained temperature-control issue must be referred to the office and consignor before movement.
- Move the package carefully using a suitable container, trolley or handling aid where required.
- Secure the package upright and protected from movement, impact, direct heat and unauthorised access.
- Lock the vehicle whenever it is unattended and record “Package on board” only after custody has been accepted.
Direct transport and temperature control
The same driver remains in charge of the consignment and follows the most direct reasonable route. Packaging such as a validated shipper or dry shipper, and any temperature logger, remain under the consignor’s specified controls. Roadrunners provides temperature-controlled transport only where it has been expressly agreed in writing. The driver must not open or adjust the package unless the agreed instructions expressly require it.
- Report delays, accidents, route disruption, suspected temperature excursions or security concerns to the office immediately.
- The office informs the consignor and agrees the appropriate action; staff must not improvise a scientific, packaging or disposal decision.
Delivery and chain of custody
On arrival the courier records “arrived at delivery”, keeps the vehicle secure while reporting to the named reception point, and hands the package to an authorised recipient. The RRD proof of delivery records the recipient and time. Waiting time and completion are reported through the final driver-clear process.
Damage, leakage, loss or emergency
Do not touch or continue handling a leaking or unidentified package. Keep people away, isolate the immediate area where safe, follow the supplied emergency instructions and contact the Roadrunners office and consignor. Call 999 where there is a serious injury, exposure, fire, collision or other immediate danger. Any loss of custody, damage, spill or temperature concern must be documented and investigated.
Decontamination and confidentiality
After any suspected contamination, the vehicle or equipment must not return to service until suitable decontamination has been completed and recorded using the consignor’s information and competent advice. Consignment details and personal or medical information must be limited to those who need them for the service, kept secure and handled under Roadrunners’ data-protection arrangements.
Operational contact
Roadrunners’ Nottingham office is available 24 hours a day, 365 days a year on 0800 970 1155.
